+86 136 0176 4940
info@akoetech.com

 
 

An innovative joint prefabricated inside the column achieving blind-bolt-connection NO MORE on-site welding and NO technical workers needed

Innovative solutions for modern construction

S-CAS Steel Connection Tech

Powder coating is a durable, eco-friendly finishing process where a dry powder is electrostatically sprayed onto a metal surface, then cured with heat to form a hard, protective layer that's tougher and more uniform than conventional liquid painting

Differ from usual powder coating, which only provide anti-corrosion protection. S-CAS power coating integrates anti-corrosion and fire-resistant, and the whole process is prefabricated by an intelligent production line.

Start Your Project
S-CAS Steel Connection Technology Detail

Joint Specification

Interior Joint

Anti-rust coating

Interior Joint

Anti-rust and fire-resistant integrated coating

S-CAS Powder coating Tech Features

01

Efficient

60 mins
  • Whole coating-process only 60 minutes, and ready for shipping
  • Fully-prefabricated in factory
  • NO further work needed on-site
02

Economical

Overall cost reduce 10-20%
  • Overall cost at least 10% less than conventional treatment
  • Powder recollect and reuse, 99% utilization rate
  • NO on-site treatment needed, reduce labor cost
03

Superior Quality

4 hours fire-resistant
  • Outdoor structures:30 years maintanance-free
  • Indoor structures: same life expectancy as the building
  • For anti-rust and fire-resistant integrated coating, thickness range from 2mm-3mm
  • For only anti-rust coating, thickness range from 0.1mm-0.12mm
04

Eco-Friendly

ZERO VOC emission
  • ZERO VOC emission
  • NO wet painting both in-factory and on-site
  • NO MORE occupational diseases for workers

Comparison

 

Traditional painting S-CAS Powder Coating

Environment

Pollution

Open spraying, 50% of the materials waste into the air

Closed-booth, powder recollect, 99% utilization rate

Occupational diseases

Yes, huge risks

No, closed production line

VOC emissions

lots of

ZERO

Efficiency

In-factory

Primer, intermediate and top painting, 3-7 days in factory

1 hour: coating and curing, and ready for installation

On-site

another 7 days for on-site fire-resistant painting and curing

Quality

Coating material

Solvent-based wet paints

Dry powder

Outdoor Structure

Maintenance for every 5-6 years

30 years maintenance-free

Indoor Structure

 

Same life as the building

Fire-resistant

3 hours

More than 3 hours

Thickness for fire resistent

Around 4cm

Around 0.25cm

Inspection

Difficult quality inspection on-site

Easy quality control in-factory

Cost

Labor in-factory

Lots of

little labor

Labor on-site

Lots of, high cost

No need

full life cycle

Lots of maintanence cost

Once and for all

Shanghai Akoetech Building Technology Co., Ltd. is a leading prefabricated building manufacturer and turnkey project provider in China.
Call Us Now To Speak With A Steel Building Expert
Get a free estimate from the industry’s most experienced modular building team. We have a passion for prefabricated building solutions that bring your vision to life.
Request a Quote
Copyright © 2025 akoetech All Rights Reserved
Privacy Policy
Terms of Service
Sitemap.html Sitemap.xml Powered by Globalsir
Set A Consultation Today
Name can't be empty
Message can't be empty
code
error